This is not an excuse...this is a fact.
Wednesday, January 28, 2009
Double Delight DONE!
Saturday, January 24, 2009
When to NOT clean the sewing/fabric room
Last Tuesday hubby and I discovered that the furnace was running but not putting out heat. I had been cold the day before but really did not think it was the furnace not working. After calling a repair man and getting a "first thing in the morning" appointment that turned out to be closer to noon, we soon had heat after lightening our wallets.
The problem is that access to the furnace is through the ceiling of my fabric storage and cutting room. And I needed to move vast amounts of stacked plastic bins and stacks of folded material, not to mention my super big heavy ironing board (24"X 66"). While waiting for the repairman to arrive I started sorting and moving things around while watching the Inauguration . I felt great to be straightening up this room and watching history in the making.
I dusted and swept...you know a spring clean sort of. The man came and left and I put the room back into a semblance of order. I still had all the trimming to do on my Double Delight blocks. It took me the rest of the week off and on to get them all trimmed.
So today was assembly day...but I could not find my stack of pinks for the setting triangles.
ARGGGGGGGGGGGGGGGGGGGGGGGGGGGG!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
I finally found them in another room where my quilt machine is setup. I must have known I would need them and had planned accordingly. But then forgot! So anyway:
I have both halves assembled. Hubby was so nice and went to get us Chinese food so I did not have to stop and cook today. I think this pattern is my most favorite of Bonnie's. But then I love pink.
The problem is that access to the furnace is through the ceiling of my fabric storage and cutting room. And I needed to move vast amounts of stacked plastic bins and stacks of folded material, not to mention my super big heavy ironing board (24"X 66"). While waiting for the repairman to arrive I started sorting and moving things around while watching the Inauguration . I felt great to be straightening up this room and watching history in the making.
I dusted and swept...you know a spring clean sort of. The man came and left and I put the room back into a semblance of order. I still had all the trimming to do on my Double Delight blocks. It took me the rest of the week off and on to get them all trimmed.
So today was assembly day...but I could not find my stack of pinks for the setting triangles.
ARGGGGGGGGGGGGGGGGGGGGGGGGGGGG!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
I finally found them in another room where my quilt machine is setup. I must have known I would need them and had planned accordingly. But then forgot! So anyway:
Sunday, January 18, 2009
Double Delight quilt by Bonnie Hunter
Tuesday, January 13, 2009
Double Delight quilt by Bonnie Hunter
See the little stack of crumbs to the right? I will save those to add to my crumb drawer.
I started the Double Delight part #3 with these 9-patches instead of at clue#1. With a blizzard heading our way I hope to have the quilt completed this week! Come on snow!!!!!!!!!!
Wednesday, January 7, 2009
NYE Mystery from Fabricholics status
Tuesday, January 6, 2009
NYE Mystery from Fabricholics status
Subscribe to:
Posts (Atom)